This is what drillWatch typically looks like. Any box you see can also be displayed in the investors area of your current website! Click on a hole number to edit it, and feel free to change anything and everything you see. This website will automatically reset each night.

Click here to return to order page

SAMPLE DRILLWATCH INSTALLATION

In progress
Drillhole ID Rig Location Status Azimuth Dip Depth Start date End date
(estimated)
Comments
09DW056
(Proposed #56)
DrillCo 1Main zonePreparingVertical44mFeb 9 --
09DW017
(Proposed #17)
DrillCo 2Main zoneDrillingVertical0mAug 9 -- Give somebody the to a site about the,
09DW041
(09DW041)
DrillCo 1Main zoneStoppedVertical0mMay 4 --
09DW032
(Proposed #32)
DrillCo 1Second zoneDrillingVertical191.2mApr 27 --
Marker for current drillsites Current drillsite Marker for upcoming drillsites Upcoming drillsite Marker for completed drillsites Completed
Marker for current drillsites Current drillsite Marker for upcoming drillsites Upcoming drillsite  
Next DrillCo Rig #1 drillhole candidates
When Drillhole ID Rig Location Type Lat/Lng Azimuth Dip Depth Start date
(estimated)
Readiness
Next09DW015
(Proposed #15)
DrillCo 1Tailings storage facilityCondemnation48.40231
-120.71597
Vertical250-450m--ready
2nd09DW019
(Proposed #19)
DrillCo 1Waste dump siteHydrogeological48.40271
-120.7037
Vertical400-500m--ready
3rd09DW020
(Proposed #20)
DrillCo 1Main zoneHydrogeological48.40006
-120.70353
Vertical200-450m--ready
Next DrillCo Rig 2 drillhole candidates
When Drillhole ID Rig Location Type Lat/Lng Azimuth Dip Depth Start date
(estimated)
Readiness
Next09DW012
(Proposed #12)
DrillCo 2Plant siteCondemnation48.40442
-120.7161
Vertical150-350m--ready
Help me to find the,
2nd09DW013
(Proposed #13)
DrillCo 2Main zoneGeotechnical48.40472
-120.71975
Vertical200-450m--ready
3rd09DW014
(Proposed #14)
DrillCo 2Main zoneHydrogeological48.40231
-120.7194
Vertical150-400m--ready
Recently completed holes
Drillhole ID Rig Location Status Azimuth Dip Depth Start date End date Comments
09DW006
(Proposed #6)
DrillCo 2Waste dump siteCore processingVertical298mApr 22Apr 25
09DW007
(Proposed #7)
DrillCo 2Waste dump siteCore processingVertical155mApr 18Apr 22
09DW008
(Proposed #8)
DrillCo 2Main zoneCompletedVertical457mApr 15Apr 18
Progress by type of hole
Geotechnical:685 of 1960m(34.9%)
Infill exploration:793 of 3718m(21.3%)
Hydrogeological:271 of 2471m(11%)
Condemnation:2230 of 8620m(25.9%)
Overall: 3979 of 16769m(23.7%)
Progress by location
Main zone:915 of 9971m(9.2%)
Plant site:1731 of 1981m(87.4%)
s:0 of 225m(0%)
Second zone:191 of 1525m(12.5%)
Tailings storage facility:0 of 1100m(0%)
Waste dump site:1142 of 1967m(58.1%)
Overall: 3979 of 16769m(23.7%)